Answer Key

1 B
Ref: PMBOK® guide 5th ed. Page 364.

2 D
Ref: PMBOK® guide 5th ed. Page 171.
Triangular Distribution Time estimate = (Optimistic time estimate + Most likely time estimate + Pessimistic time estimate) / 3
(2+6+4)/3=4 which is not an option in the above list.”

3 C
Ref: PMBOK® guide 5th ed. Page 364.

4 B
Ref: PMBOK® guide 5th ed. Page 366.

5 D
Ref: PMBOK® guide 5th ed. Page 376.

6- 4(A, C)
Ref: PMBOK® guide 5th ed. Page 404.

7 B
Ref: PMBOK® guide 5th ed. Page 408.

8- 3 (All of the above)

9 D
Ref: PMBOK® guide 5th ed. Page 235.

10 D
Ref: PMBOK® guide 5th ed. Page 235.

11 B
Ref: PMBOK® guide 5th ed. Page 237.
Explanation: Pareto principle identifies the key issues that should be fixed to resolve 80% of the problems. In this case, if the first 3 issues are fixed, that fixes 80% of the support issues. 

12 D
Ref: PMBOK® guide 5th ed. Page 250, https://en.wikipedia.org/wiki/Mean_time_between_failures

13 B
Ref: PMBOK® guide 5th ed. Page 238.

14 A
Ref: PMBOK® guide 5th ed. Page 116.

15 B
Explanation: The time taken for each of the paths is as follows:
ABCDE?5d+5d+2d+1d=13d
AFGCDE?2d+3d+1d+2d+1d=7d
AHIDE?3d+6d+3d+1d=13d
Since AHIDE and ABCDE take the same time to complete and are the longest paths, they are the critical paths for this project. Total float is 0 on the critical path.

16 A
Ref: PMBOK® guide 5th ed. Page 362.

17 A

18- 1(A and B)
Ref: PMBOK® guide 5th ed. Page 179.

19- 3(A, B, C)
Ref: PMBOK® guide 5th ed. Page 181.

20 C
Ref: PMBOK® guide 5th ed. Page 221. 
EAC = AC + [(BAC – EV) / (CPI × SPI)]
EAC=1000+[(1200-900)/(1.2*0.9)]=$1277.77

21 A
Ref: PMBOK® guide 5th ed. Page 364.

22 B
Ref: PMBOK® guide 5th ed. Page 364.

23- 3(C, D, A)
Ref: PMBOK® guide 5th ed. Page 351.

24 B
Ref: PMBOK® guide 5th ed. Page 364.

25 B
Ref: PMBOK® guide 5th ed. Page 364.
Explanation: 
Initial estimate=$5000
Incentive promised if performance conditions are met=$1000
Overage=20% of $5000=$1000
Agreement between buyer and seller was to share the departure from original estimate at a pre-determined rate of 70 (buyer)/30 (seller).
70% of overage=$700
Seller to pay=Initial estimate+Incentive+70% of overage =$5000+$1000+$700=$6700

26 B
Ref: PMBOK® guide 5th ed. Page 364.
Explanation: 
Overage=20% of $5000=$1000
Agreement between buyer and seller was to share the departure from original estimate at a pre-determined rate of 70 (buyer)/30 (seller).
30% of overage=$300 which seller has to bear.

27 C
Ref: PMBOK® guide 5th ed. Page 364.

28 D
Ref: PMBOK® guide 5th ed. Page 364.

29 B
Ref: PMBOK® guide 5th ed. Page 355.

30 B
Ref: PMBOK® guide 5th ed. Page 365.

31 C
Ref: PMBOK® guide 5th ed. Page 365.

32 D
Ref: PMBOK® guide 5th ed. Page 365.

33 A
Ref: PMBOK® guide 5th ed. Page 356.

34- 4(All of the above)
Ref: PMBOK® guide 5th ed. Page 366-367.

35 B
Ref: PMBOK® guide 5th ed. Page 367.

36- 3(A, B, C)
Ref: PMBOK® guide 5th ed. Page 368.

37- 3(A, B, C)
Ref: PMBOK® guide 5th ed. Page 368.

38- 4(A, B, C, D)
Ref: PMBOK® guide 5th ed. Page 368.

39 D
Ref: PMBOK® guide 5th ed. Page 368.

40 C
Ref: PMBOK® guide 5th ed. Page 369.

41 B
Ref: PMBOK® guide 5th ed. Page 369.
Explanation: Copyright is an intellectual property. 

42 C
Ref: PMBOK® guide 5th ed. Page 374.

43 A
Ref: PMBOK® guide 5th ed. Page 375.

44- 4(A, C, D)
Ref: PMBOK® guide 5th ed. Page 375.

45 A
Ref: PMBOK® guide 5th ed. Page 357.

46- 4(A, B, C, D)
Ref: PMBOK® guide 5th ed. Page 375-376.

47 C
Ref: PMBOK® guide 5th ed. Page 377-Agreements.

48- 4(All of the above)
Ref: PMBOK® guide 5th ed. Page 377-Agreements.

49 D
Ref: PMBOK® guide 5th ed. Page 377-Agreements and Procurement negotiations.

50 D
Ref: PMBOK® guide 5th ed. Page 378.

51 A
Ref: PMBOK® guide 5th ed. Page 378.

52 B
Explanation: Alternative dispute resolution is a way to solve issues, out of court.
Conciliation, mediation, and arbitration are alternative dispute resolution methods.

53- 4(A, B, C, D)
Ref: PMBOK® guide 5th ed. Page 381.

54 D
Ref: PMBOK® guide 5th ed. Page 378, 381.

55- 4(A, B, C, D)
Ref: PMBOK® guide 5th ed. Page 381.

56 A
Ref: PMBOK® guide 5th ed. Page 381.

57 A
Ref: PMBOK® guide 5th ed. Page 228.

58- 4 (A,B,C,D)
Ref: PMBOK® guide 5th ed. Page 235.

59- 2(A,B)

60 C
Ref: PMBOK® guide 5th ed. Page 383.

61- 3(A, B, C)
Ref: PMBOK® guide 5th ed. Page 384.

62 A
Ref: PMBOK® guide 5th ed. Page 384.

63- 4(None of the above)
Ref: PMBOK® guide 5th ed. Page 387.
Explanation: All of the above are true for early contract terminations.

64 A
Ref: PMBOK® guide 5th ed. Page 387.

65 C
Ref: PMBOK® guide 5th ed. Page 388-Procurement negotiations.

66 A
Ref: PMBOK® guide 5th ed. Page 393-Identify Stakeholders.

67- 2(A, B, D)
Ref: PMBOK® guide 5th ed. Page 394.
In some cases, residents protest and prevent the dam construction from starting hence influencing the project.

68- 4(All of the above)
Ref: PMBOK® guide 5th ed. Page 394.

69- 4(All of the above)

70 B
Ref: PMBOK® guide 5th ed. Page 397.

71 C
Ref: PMBOK® guide 5th ed. Page 397.

72 C
Ref: PMBOK® guide 5th ed. Page 398.

73 A
Ref: PMBOK® guide 5th ed. Page 398.

74-4 (All of the above)
Ref: PMBOK® guide 5th ed. Page 398.

75- 2(A, C)
Ref: PMBOK® guide 5th ed. Page 401.

76- 4(A, B, D)
Ref: PMBOK® guide 5th ed. Page 402.

77 B 
Ref: PMBOK® guide 5th ed. Page 397.

78 A
Ref: PMBOK® guide 5th ed. Page 397.

79- 4(A, B, C, D)
Ref: PMBOK® guide 5th ed. Page 403.

80- 3(All of the above)
Ref: PMBOK® guide 5th ed. Page 357.

81 D
Ref: PMBOK® guide 5th ed. Page 405.

82- 4(All of the above)
Ref: PMBOK® guide 5th ed. Page 407.

83- 3(C)
Ref: PMBOK® guide 5th ed. Page 357.

84 A
Ref: PMBOK® guide 5th ed. Page 406.

85- 4(A, B, C, D)
Ref: PMBOK® guide 5th ed. Page 408

86 C
Ref: PMBOK® guide 5th ed. Page 228.

87 A
Ref: PMBOK® guide 5th ed. Page 228.

88 B
Ref: PMBOK® guide 5th ed. Page 228.

89 C
Ref: PMBOK® guide 5th ed. Page 228.

90 A
Ref: PMBOK® guide 5th ed. Page 228.

91- 4(A, B, C, D)
Ref: PMBOK® guide 5th ed. Page 229.

92 A
Ref: Wikipedia

93 A
Ref: Wikipedia

94 C
Ref: PMBOK® guide 5th ed. Page 229.

95 C
Ref: PMBOK® guide 5th ed. Page 231.

96 D
Ref: PMBOK® guide 5th ed. Page 235.

97- 3(All of the above)
Ref: PMBOK® guide 5th ed. Page 357

98- 2(A, B)
Ref: PMBOK® guide 5th ed. Page 235.

99- 3(All of the above)
Ref: PMBOK® guide 5th ed. Page 357

100 A
Ref: PMBOK® guide 5th ed. Page 237.

101- 4(A, B, C, D)
Ref: PMBOK® guide 5th ed. Page 237.

102 A
Ref: PMBOK® guide 5th ed. Page 359

103 B
Ref: PMBOK® guide 5th ed. Page 238.

104 B
Ref: PMBOK® guide 5th ed. Page 238.

105 B
Ref: PMBOK® guide 5th ed. Page 361

106 B
Ref: PMBOK® guide 5th ed. Page 238.

107 B
Ref: PMBOK® guide 5th ed. Page 239.

108 C
Ref: PMBOK® guide 5th ed. Page 240.

109 A
Ref: PMBOK® guide 5th ed. Page 240.

110 B
Ref: PMBOK® guide 5th ed. Page 242.

111 C
Ref: PMBOK® guide 5th ed. Page 245., Google.com results

112 D
Ref: PMBOK® guide 5th ed. Page 247.

113 B
Ref: PMBOK® guide 5th ed. Page 360

114 C
Ref: PMBOK® guide 5th ed. Page 250, 252.

115- 4(A, B, C, D)
Ref: PMBOK® guide 5th ed. Page 66.

116 C
Ref: PMBOK® guide 5th ed. Page 67.

117 A
Ref: PMBOK® guide 5th ed. Page 68.

118 D
Ref: PMBOK® guide 5th ed. Page 68.

119- 3(A,D)
Ref: PMBOK® guide 5th ed. Page 242.

120- 4(All of the above)
Ref: PMBOK® guide 5th ed. Page 68.

121- 4(All of the above)
Ref: PMBOK® guide 5th ed. Page 84.

122- 4(All of the above)
Ref: PMBOK® guide 5th ed. Page 85.

123- 4(All of the above)
Ref: PMBOK® guide 5th ed. Page 85.

124 C
Ref: PMBOK® guide 5th ed. Page 85.

125- 4(A, B, C, D)
Ref: PMBOK® guide 5th ed. Page 96.

126 C
Ref: PMBOK® guide 5th ed. Page 96.

127 B
Ref: PMBOK® guide 5th ed. Page 97.

128 D
Ref: PMBOK® guide 5th ed. Page 97.

129- 4(A, B, C, D)
Ref: PMBOK® guide 5th ed. Page 105-106.

130 D
Ref: PMBOK® guide 5th ed. Page 109-110.

131- 4(A, B, C, D)
Ref: PMBOK® guide 5th ed. Page 110.

132 B
Ref: PMBOK® guide 5th ed. Page 112.

133 D
Ref: PMBOK® guide 5th ed. Page 112.

134 B
Ref: PMBOK® guide 5th ed. Page 112.

135 B
Ref: PMBOK® guide 5th ed. Page 112.

136 B
Ref: PMBOK® guide 5th ed. Page 112.

137 B
Ref: PMBOK® guide 5th ed. Page 114.

138 C
Ref: PMBOK® guide 5th ed. Page 114.

139 C
Ref: PMBOK® guide 5th ed. Page 114.

140 A
Ref: PMBOK® guide 5th ed. Page 114.

141 D
Ref: PMBOK® guide 5th ed. Page 114.

142- 3(A, B, C)
Ref: PMBOK® guide 5th ed. Page 114.

143 A
Ref: PMBOK® guide 5th ed. Page 115.

144 A
Ref: PMBOK® guide 5th ed. Page 115.

145 B
Ref: PMBOK® guide 5th ed. Page 115.

146 B
Ref: PMBOK® guide 5th ed. Page 116.

147- 2(A, B, C)
Ref: PMBOK® guide 5th ed. Page 362

148 C
Ref: PMBOK® guide 5th ed. Page 119.

149 D
Ref: PMBOK® guide 5th ed. Page 124.

150 A
Ref: PMBOK® guide 5th ed. Page 131.

151 A
Ref: PMBOK® guide 5th ed. Pg 147

152 D
Ref: PMBOK® guide 5th ed. Page 153.

153 D
Ref: PMBOK® guide 5th ed. Page 157.

154 D
Ref: PMBOK® guide 5th ed. Page 158.

155 C
Ref: PMBOK® guide 5th ed. Page 158.

156 D
Ref: PMBOK® guide 5th ed. Page 159.

157 C
Ref: PMBOK® guide 5th ed. Page 163.

158 D
Ref: PMBOK® guide 5th ed. Page 163.

159 A
Ref: PMBOK® guide 5th ed. Page 170.

160 B
Ref: PMBOK® guide 5th ed. Page 171.
Triangular Distribution time estimate = (Optimistic time estimate + Most likely time estimate + Pessimistic time estimate) / 3
(2+4+6)/3=4.”

161 C
Ref: PMBOK® guide 5th ed. Page 355.

162 D
Ref: PMBOK® guide 5th ed. Page 171.
Triangular Distribution time estimate = (Optimistic time estimate + Most likely time estimate + Pessimistic time estimate) / 3
Since the pessimistic estimate is not provided, the expected duration cannot be determined using the triangular distribution.”

163 B
Ref: PMBOK® guide 5th ed. Page 171.
Beta Distribution (from the traditional PERT technique) Time estimate = (Optimistic time + (4*Most likely time) + Pessimistic time) / 6
For the above question, Time estimate=(2+4(4)+6)/6=4.”

164 D
Ref: PMBOK® guide 5th ed. Page 171.
Beta Distribution (from the traditional PERT technique) Time estimate = (Optimistic time + (4*Most likely time) + Pessimistic time) / 6
For the above question, Time estimate=(2+4(4)+6)/6=4 which is not an option above.”

165 D
Ref: PMBOK® guide 5th ed. Page 171.
Beta Distribution (from the traditional PERT technique) Time estimate = (Optimistic time + (4*Most likely time) + Pessimistic time) / 6
For the above question, the most likely estimate is not provided and hence the expected duration cannot be calculated using beta distribution.”

166 C
Explanation: The time taken for each of the paths is as follows:
ABCDE?5d+5d+2d+1d=13d
AFGCDE?2d+3d+1d+2d+1d=9d
AHIDE?4d+6d+3d+1d=14d
Since AHIDE is the path with the longest duration, it is the critical path for this project.

167 A
Explanation: The time taken for each of the paths is as follows:
ABCDE?5d+5d+2d+1d=13d
AFGCDE?2d+3d+1d+2d+1d=9d
AHIDE?3d+6d+3d+1d=13d
Since AHIDE and ABCDE take the same time to complete and are the longest paths, they are the critical paths for this project.

168 C
Ref: PMBOK® guide 5th ed. Page 362

169 C
Explanation: Both activities B and C have to be completed before activity D can start. Activity C ends on Mar 8 (EF). Activity B ends on Mar 9 (EF). Since the latest EF is Mar 9, D can start only on Mar 10.

170 A
Explanation: The duration of activity A is 4 days. If activity A starts on Mar 3, it will finish by end of day, Mar 6. Hence EF date is Mar 6.

171 A



172 B
Ref: PMBOK® guide 5th ed. Page 363.

173 B
Explanation: PMBOK® guide 5th ed. Page 178.

174 C
Explanation: PMBOK® guide 5th ed. Page 178.

175 A
Explanation: PMBOK® guide 5th ed. Page 178.

176 D
Explanation: PMBOK® guide 5th ed. Page 179.

177 C
Ref: PMBOK® guide 5th ed. Page 363.

178 D
Explanation: PMBOK® guide 5th ed. Page 180.

179 A
Explanation: PMBOK® guide 5th ed. Page 181.

180 B
Explanation: PMBOK® guide 5th ed. Page 181.

181 D
Ref: PMBOK® guide 5th ed. Page 363.

182 D
Explanation: PMBOK® guide 5th ed. Page 181.

183- 3(Both A and B)
Explanation: PMBOK® guide 5th ed. Page 181.

184- 3(A, B, C)
Explanation: PMBOK® guide 5th ed. Page 182.

185- 2(A, B)
Explanation: PMBOK® guide 5th ed. Page 184.

186- 4(A, B, C, D)
Explanation: PMBOK® guide 5th ed. Page 182.

187 A
Explanation: PMBOK® guide 5th ed. Page 197.

188 A
Explanation: PMBOK® guide 5th ed. Page 201.

189 D
Explanation: PMBOK® guide 5th ed. Page 204.

190- 2(A, B)
Explanation: PMBOK® guide 5th ed. Page 204-205.

191- 4(A, B, C, D)
Explanation: PMBOK® guide 5th ed. Page 208.

192- 2(None of the above)
Explanation: PMBOK® guide 5th ed. Page 216. 
All of the above are included in project cost control.

193 B
Explanation: PMBOK® guide 5th ed. Page 220.
EAC = AC + (BAC – EV)
EAC=1000+1200-900=$1300.

194 B
Explanation: PMBOK® guide 5th ed. Page 220.
EAC = BAC / CPI
EAC=1200/1.2=$1000

195 B
Ref: PMBOK® guide 5th ed. Page 363.

196- 3(A,D)
Ref: PMBOK® guide 5th ed. Page 242.

197 D
Explanation: PMBOK® guide 5th ed. Page 8. 

198 C
Explanation: PMBOK® guide 5th ed. Page 8. 

199 D
Explanation: PMBOK® guide 5th ed. Page 8. 

200 B
Explanation: PMBOK® guide 5th ed. Page 9. 

1 comment:

  1. Dear La,

    Thanks for sharing these invaluable questions, they are really of big help.

    Please check response for question 43. It seems option B is more pertinent to the question.

    Thanks

    ReplyDelete